Inscrivez-vous maintenant pour un meilleur devis personnalisé!

Nouvelles chaudes

NZ telcos told to create marketing code by ComCom to reduce customer confusion

07 nov. 2021 Hi-network.com
Image: Chris Duckett/ZDNet

The New Zealand Commerce Commission (ComCom) has directed the local telco industry to create a marketing code to reduce customer confusion. The Commission said the code was needed due to Chorus withdrawing copper services and Spark pulling its public switched telephone network connections.

The New Zealand Telecommunications Forum (TCF) has been given 60 working days to develop a binding code that will give users "sufficient notice" of any copper service change, that customers will know about the "full range" of alternative services including those from other providers, and information on how alternative services would perform.

Users need to be told "actual peak" speeds and not the theoretical maximums of a connection technology.

"Consumers have told us that marketing of alternatives to legacy copper-based services is often incomplete, confusing or misleading," Telecommunications Commissioner Tristan Gilbertson said. "Providers have also contacted us with concerns about their competitors' behaviour."

"While we have given the TCF 60 working days to create an industry code, we expect providers to bring their marketing into line with these guidelines as soon as possible, so that consumers can make an informed choice about the technologies and plans that are best for their telecommunications needs."

In August, Gilbertson published a letter asking for industry views to address the confusion issue.

"We have examples of people being told they need to move now because Chorus and Spark are in the process of withdrawing their copper or PSTN service when withdrawal isn't even scheduled yet, and marketing materials are making claims about the performance of alternative technologies that don't reflect real-world performance," he said at the time.

Related Coverage

  • Vodafone NZ to drop legacy copper landlines by April 2021
  • AWS to launch first data centre region in New Zealand by 2024
  • Kiwis to see 100/20Mbps fibre lines jump to 300/100Mbps thanks to Chorus boost
  • Chorus profit dips 10% from COVID-19 headwinds and increased competition
  • Roaming revenue drop leads to full-year declines for Spark

tag-icon Tags chauds: Maison & bureau réseautage

Copyright © 2014-2024 Hi-Network.com | HAILIAN TECHNOLOGY CO., LIMITED | All Rights Reserved.